Part of the EUDR guide
Practical guide · Geolocation

EUDR geolocation of plots of land: 4 ha threshold, polygons and practical cases

The EUDR (EU Deforestation Regulation), known in French by the acronym RDUE (règlement de l'Union européenne sur la déforestation), requires the precise location of every plot of land where a relevant commodity was produced, and this information must then be reported in the due diligence statement - the DDS (Due Diligence Statement).

In short

Three principles frame all data collection:

  • The threshold is 4 hectares. A plot of land of 4 ha or less can be located with a GPS point (a latitude/longitude pair). A plot of land of more than 4 ha must be described by a polygon tracing its perimeter - except for cattle, where the logic is different.
  • Precision is regulated. Each coordinate has at least six decimal places, in WGS 84 (EPSG:4326), longitude before latitude.
  • The import format of the EUDR information system is GeoJSON (a geographic data exchange format derived from JSON).

The real work is therefore not the threshold itself, but field collection from suppliers and quality control of the geometries received. That is the subject of this article.

What the regulation requires exactly

The obligation is set out in Article 9(1)(d) of Regulation (EU) 2023/1115: the DDS must contain the geolocation of all plots of land where the relevant commodities were produced. The definition of “geolocation” is given in Article 2, point 28. These two articles form the foundation of your entire data set-up.

The 4-hectare threshold, as written

SituationExpected geolocation
Plot of land of more than 4 ha, commodity other than cattlePolygon: perimeter coordinates, with enough points to describe the geometry of the plot
Plot of land of 4 ha or lessA single point (latitude and longitude) is enough; a polygon is still accepted
CattleGeolocation covers the establishments where the animals were kept, not an agricultural plot of land
Minimum precisionAt least six decimal places for each coordinate

Three nuances are regularly misread:

  • “More than 4 hectares” means strictly greater than 4. A plot of exactly 4 hectares is not “of more than 4 hectares”: a single point is allowed. In practice, when a polygon is available, providing it secures this borderline case and makes checks easier.
  • A polygon describes one production plot of land, not an approximate area covering several plots. Unconnected pieces of land are considered separate plots, even if they belong to the same owner.
  • The threshold does not apply to cattle. For this sector, geolocation concerns the places where the animals are kept.

Why this threshold shapes your entire collection

The 4 ha threshold is not an administrative detail: it creates two very different levels of effort.

  • A point can be recorded with a smartphone in a few seconds. A polygon requires walking the perimeter, or drawing a geometry on imagery and having it validated.
  • The threshold creates borderline cases: plots close to 4 ha must be measured, not estimated from memory, or you risk choosing the wrong method.
  • It determines what the authority can verify. With a polygon, the actual plot is analysed against deforestation layers. With a point, verification is done using a buffer zone, and is therefore coarser.
  • It determines the format sent to the EUDR information system: a polygon geometry or a simple point.

The general framework of these obligations - product scope, due diligence, operator roles - is detailed in our guide to the EUDR.

Application dates to remember

The timetable was postponed by the amendments of December 2024 and December 2025. The application dates are now:

Companies concernedDate of application
Large and medium-sized companies30 December 2026
Micro and small enterprises already covered by the EU Timber Regulation (EUTR)30 December 2026
Other micro and small enterprises30 June 2027
Products newly added to the scope (Delegated Regulation (EU) 2026/2102)30 December 2027

Geolocation must be prepared ahead of the DDS: collection lead times with distant suppliers - often several months - must be built into the backward schedule.

“[…] for plots of land of more than four hectares used for the production of the relevant commodities other than cattle, this shall be provided using polygons […]”Regulation (EU) 2023/1115, Article 2, point 28 · consolidated text, EUR-Lex

GPS point or polygon: the difference and its operational consequences

A GPS point (Global Positioning System) is a latitude/longitude pair. A polygon is an ordered sequence of vertices which, when joined, form a closed ring delimiting the plot of land. The two require neither the same work nor offer the same evidential strength.

CriterionGPS pointPolygon
EUDR use casePlot ≤ 4 ha (excluding cattle)Plot > 4 ha (excluding cattle); also possible for ≤ 4 ha
Data producedA latitude/longitude pairA sequence of vertices closing a ring
Collection effortLow (recorded with a smartphone)High (field tracing, imagery, validation)
Required precision≥ 6 decimal places≥ 6 decimal places per vertex, closed geometry
Verification by the authorityUsing a buffer zone around the pointAnalysis of the actual plot
Main riskMisplaced point (outside the plot, on a road)Invalid geometry, self-intersection, wrong coordinate system
Operational impactQuick but hard to proveMore demanding but much more robust in an inspection
Practical consequence

for a point, place it well inside the plot, ideally near the centre, never on an access road or a boundary. For a polygon, favour geometric quality over the number of vertices: a clean, closed outline is better than a thousand poorly aligned points.

Point or polygon: the 4-hectare rule

  1. Plot of land of 4 ha or lessA GPS point (latitude and longitude) is enough; a polygon is still accepted
  2. Plot of land of more than 4 haPolygon describing the perimeter of the plot (excluding cattle)
  3. Format and precisionWGS 84, at least six decimal places, longitude before latitude
  4. Check on receiptValid geometry, consistent area, correct country of production
Point provided for a plot of more than 4 haLatitude and longitude swappedInsufficient precision

For cattle, geolocation covers the establishments where the animals are kept, not a plot of land.

Expected file formats: GeoJSON, WKT and KML

Three families of formats recur in geographic data exchange:

  • GeoJSON: a JSON-based geographic data exchange format, readable by web tools and GIS (geographic information system) software.
  • WKT (Well-Known Text): a text representation of a geometry, common in geospatial databases.
  • KML (Keyhole Markup Language): an XML format popularised by consumer mapping, useful for visualising a boundary.
FormatCommon sourceUse in the EUDR information systemKey point
GeoJSONGIS exports, APIs, web toolsCoordinate import format; the documentation describes the expected structureReference format: WGS 84, longitude/latitude order, closed ring
WKTPostGIS, databases, some ERPsConversion required before importWatch out for multi-part geometries
KMLConsumer mapping, field surveysConversion required before importUseful for visualising and validating with the producer
Shapefile (SHP)Desktop GIS softwareConversion required before importMulti-file format, a frequent source of errors

Common format errors

  1. Reversed coordinate order: putting latitude then longitude. In GeoJSON, the rule is [longitude, latitude].
  2. Wrong coordinate system: data in a local projection (UTM, Lambert) instead of WGS 84 / EPSG:4326.
  3. Unclosed ring: the last point must be identical to the first.
  4. Self-intersection: the geometry crosses itself and becomes invalid.
  5. Coordinates in sexagesimal degrees (degrees/minutes/seconds) instead of decimal format.
  6. Insufficient number of decimal places, or rounding that is too coarse.
  7. Several plots merged into a single geometry.
  8. File too large: the system documentation sets a limit of 25 MB per statement, GeoJSON files included.
  9. Incorrect structure: mixing Feature and FeatureCollection, or Point and Polygon types.
  10. Decimal separator: a comma instead of a full stop, which breaks the file's interpretation.

How to collect polygons from suppliers who have none

Many producers have neither GPS surveys nor a usable cadastral map. Collection must therefore be organised, not improvised. Here are the methods, ranked in decreasing order of reliability.

Field tracing with a smartphone (reference method)

The producer or a technician walks around the plot with a GPS survey app, closes the loop and saves. The file comes out in WGS 84, to be converted to GeoJSON if needed. This is the most reliable method, but it requires a smartphone, a minimum of training and network coverage or an app that works offline.

Satellite imagery and joint validation

The plot is delineated on a satellite image, then the outline is validated by the producer: on-screen review, signature or confirmation photo. This approach covers large areas quickly, provided a traceable validation is obtained to avoid later disputes.

Land registries, cadastre and cooperatives

Retrieving plots already mapped by a cadastre, a cooperative or a producer organisation avoids starting from scratch. The geometries must nevertheless be converted and checked before integration.

Going through the aggregator or trader

When the direct supplier is an aggregator, it is often responsible for upstream collection. Clarify contractually who provides which geometry and in what format, rather than discovering the gaps at DDS time.

Assisted manual tracing, as a last resort

Without a field survey, the outline is drawn on a satellite background with the producer, then the resulting area is checked. To be reserved for simple, well-delimited plots.

A minimum collection protocol

Whatever the method, require for each plot of land: a unique identifier, the identity of the producer, the crop, the declared area, the geometry in WGS 84 (≥ 6 decimal places), the survey method, the date, and proof of validation (photo, signature). Without these fields, the geometry is unusable.

Quality control of received geometries

A raw geometry as received is almost never ready to use. These checks, to be automated as far as possible, avoid discovering a problem when submitting the DDS.

CheckWhat is checkedWhy it is critical
Self-intersectionThe ring does not cross itselfA self-intersecting geometry is invalid and may be rejected
Ring closureFirst point = last pointStructural requirement of the GeoJSON format
Coordinate orderLongitude before latitudeSwapping them places the plot in the wrong location
Coordinate systemWGS 84 / EPSG:4326A local projection shifts or distorts the plot
Number of decimal places≥ 6 per coordinateRegulatory precision requirement
AreaConsistency with the declared areaDetects gross errors and duplicates
OverlapNo overlap between plotsAn overlap signals an incorrect boundary
Geographic consistencyThe plot is in the declared country or region of productionAvoids out-of-area geometries
Ring directionOrientation of the outer boundaryThe GeoJSON specification recommends a direction; some tools check it

Systematic upstream quality control avoids three costly consequences: a rejected import, a mislocated plot that weakens the proof, and a late correction that is impossible to obtain from a distant supplier.

Linking plot, batch and supplier record

An isolated geolocation is useless: it must be linked to the commodity it supports. The complete data model is detailed in our guide EUDR and supplier data in the ERP. This is the role of the linking key between three objects.

ObjectIdentifierKey fieldsLinked to
SupplierSupplier IDCompany name, country, status, quality contactIts plots of land
Plot of landPlot ID (unique)Geometry, area, crop, survey method and dateBatches from the plot
BatchBatch IDWeight or volume, harvest date, transportSource plots and DDS

Two practical rules:

  • A batch can come from several plots, and a plot can supply several batches. Linking is done by identifier, never by free-text description.
  • Version your geometries. A corrected plot must keep its history, with the date of the correction and its justification.

In the event of an inspection, this mesh lets you answer a simple question: does this specific batch really come from these specific plots? The other expected evidence is listed in our EUDR audit checklist.

Practical cases by supplier type

TypeTypical situationCollection strategyWatch point
Smallholder (≤ 4 ha)Plots of a few fractions of a hectare, often scatteredGPS point recorded with a smartphone, local trainingThe point must fall inside the plot
Medium-sized farm (> 4 ha)Several plots, contiguous or notOne polygon per plot, field tracing or validated imageryNever merge separate plots
Cooperative / aggregatorCollection from many smallholdersContractual framework for who collects and in what formatHeterogeneity of the data received
Merchant / traderBuys and resells without producingRequire upstream geometries to be passed onData received without a plot identifier
Processor / plantWood, oil, food: multiple inputsMap the supply chain supplier by supplierMixing of batches from different origins

Two cross-cutting lessons: data quality deteriorates further upstream in the chain, so the further downstream you are, the more you need to frame requirements by contract; and the smaller the supplier, the more support collection needs (training, tools, time). This is typically the case in the cocoa and palm oil sectors.

Common mistakes (and how to avoid them)

  1. Confusing point and polygon at the threshold, particularly for a plot of exactly 4 ha.
  2. Focusing on format before data: a perfectly formatted GeoJSON based on an approximate boundary remains unusable.
  3. Accepting geometries without a plot identifier, making linking to batches impossible.
  4. Not requiring the coordinate system, and discovering a local projection at import.
  5. Starting collection at DDS time, when it takes months.
  6. Concatenating several plots into a single geometry.
  7. Ignoring overlaps between plots of different suppliers.
  8. Not versioning corrected geometries.
  9. Not tracing the provenance of each data item (survey method, date, validator).
  10. Letting each site collect with its own conventions, at the expense of master data consistency.

Operational checklist

  • Before collection
  • List the suppliers and plots of land within the scope of the regulation.
  • Measure areas to apply the 4 ha threshold.
  • Define a unique plot identifier and a standard collection form.
  • Choose collection methods according to supplier type.
  • During collection
  • Record in WGS 84 (EPSG:4326), longitude before latitude, ≥ 6 decimal places.
  • Close each polygon ring.
  • Document the method, date and validator.
  • After collection
  • Check self-intersection, ring closure and area consistency.
  • Check there is no overlap between plots.
  • Convert to compliant GeoJSON and test the import.
  • Link each plot to batches and the supplier record.
  • Governance
  • Version geometries and trace corrections.
  • Plan regular updates, as a plot can change.

Key takeaways

The 4-hectare threshold determines the method, the format and the workload: a GPS point for small plots, a polygon for large ones, with standardised precision and coordinate system. Your added value does not lie in the final import, but in three links: collection from suppliers who sometimes lack data, quality control of geometries, and the plot-batch-supplier link.

In practice, the next step is to map your suppliers concerned, measure areas, then industrialise a collection and control protocol.

With Tracklab

Tracklab is a supplier and product data centralisation platform: it lets you bring your supplier and product information together in one place, automate document collection, track deadlines, structure data and use AI to exploit the information contained in documents to make the preparation of your statements more reliable.

FAQ

Geolocation: your questions.

A plot of exactly 4 hectares: point or polygon?

A GPS point is enough. The regulation refers to plots “of more than 4 hectares” to require a polygon; exactly 4 hectares therefore falls under the point case, excluding cattle.

Can I provide a single polygon for several neighbouring plots?

No. Each production plot of land must be identified separately, even if the plots belong to the same owner or are adjacent.

Which coordinate system and what precision should be used?

WGS 84 (EPSG:4326), in decimal degrees, in longitude/latitude order and with at least six decimal places per coordinate.

My suppliers have no geographic data. Where should I start?

With a collection protocol: field surveys with a smartphone first, then satellite imagery validated by the producer, reusing cadastral or cooperative data where it exists. The key is to record the method and date for each plot of land.

Is a polygon mandatory for cattle?

No. For this sector, geolocation covers the establishments where the animals were kept, not an agricultural plot of land subject to the 4 ha threshold.

Points, polygons, GeoJSON: does your data hold up?

In 30 minutes, we review your suppliers, your plots of land and the format of your geometries.

Our clients

Reliable supplier data, managed with Tracklab.

Their quality and purchasing teams collect, control and leverage their supplier data with Tracklab.

150+

companies supported

40,000+

suppliers referenced

70,000+

products and ingredients

Customer testimonial · Bouvard
“Tracklab has eliminated the blind spots that existed in our document monitoring. Every document is analysed, every change is detected and every decision is traceable. This has enabled us to take a real step forward in terms of professionalism and credibility, particularly with auditors and customers.”
EVEllen V.Quality Director, Bouvard Pro
CyberVadis
CyberVadis Excellence rating

Independent assessment of our cybersecurity framework and of the protection of the data entrusted to Tracklab.

They use Tracklab

  • Somapro
  • Jean Niel
  • La Fournée Dorée
  • Nautilus
  • Cérélia
  • Will&Co
  • Neta
  • Diffusions Aromatiques