Prêts pour 2027 ? Faire de la donnée fournisseur un actif de conformité
Jeudi 10 décembre11h – 11h45 en ligneavec François Cadoret
Audits, référentiels qualité, PPWR, REP emballages professionnels : en 2027, vous devrez tout prouver, à vos clients comme aux auditeurs, et ces preuves viennent de vos fournisseurs. Comment les obtenir dès maintenant, sans les relancer à chaque demande.
Conformité : ce que vérifient les audits et les référentiels qualité
Nouvelles exigences : PPWR, REP Pro et ce qui change d’ici 2027
Approving a new supplier: from the purchasing request to the quality decision, without back-and-forth.
A buyer has found a new supplier, but cannot place an order until quality has approved the file. Here is how our clients cut their supplier approval lead time by 50 to 60%, without lowering their standards.
Approving a supplier means adding it to the company's approved supplier list after checking that it can deliver products that meet your quality, technical and regulatory requirements. Approving a product means confirming that a material sold by this supplier can go into production.
Until this work is done, the buyer cannot order. Approval lead time therefore becomes a purchasing issue as much as a quality one: a sourcing opportunity, an alternative in case of shortage or a new product launch are all waiting on the decision.
What the standards require
IFS Food version 8 covers supplier approval and monitoring in chapter 4.4 "Purchasing" and makes raw material specifications a KO requirement (4.2.1.3). BRCGS Food Safety Issue 9 addresses it in clause 3.5.1 "Supplier and raw material approval and performance monitoring". A fast approval is only worth something if it is still traceable on audit day.
Why approving a new supplier takes time
A request that goes out incomplete. The list of documents varies by product family; when it is built case by case, the supplier receives several successive requests.
Documents that arrive by email. They have to be found, renamed and filed, and the supplier chased for whatever is missing.
Manual reading. Every certificate, specification sheet or declaration is read and re-keyed before being compared with your requirements.
Sign-offs in series. Quality, regulatory and purchasing step in one after another, with no shared view of progress.
The least equipped suppliers are penalised most: at equal quality, they take longer to build their file, which narrows sourcing options.
Which documents should you require from a new supplier?
The approval file depends on the product family and the risk it carries. The documents most often required in the food industry:
Family
Documents usually required
Raw materials and ingredients
IFS Food, BRCGS or FSSC 22000 certificate; specification sheet; allergen and GMO declarations; supplier questionnaire
Food contact packaging
Declaration of compliance with Regulation (EC) No 1935/2004 and, for plastics, Regulation (EU) No 10/2011; specification sheet; plant certificate
Specification sheet; regulatory status; allergen declaration; safety data sheet where relevant
Traders and brokers
IFS Broker certificate; identification of the original manufacturing sites
Depending on your policy, these are complemented by signed supplier specifications and supply chain certifications (organic, non-GMO…).
The 5 steps to approve a new supplier
From the purchasing request to the decision
RequestPurchasing or quality create the supplier and its product family.
RequireThe list of expected documents is generated from your requirements by family.
CollectThe supplier uploads its documents on the free, multilingual portal; reminders are automatic.
CheckEach document is pre-validated by AI, then accepted or rejected with a reason by your team.
5. Decide: approval status shared with purchasing
Principle diagram: approving a new supplier in Tracklab.
Step
What slows it down without a tool
What Tracklab does
Request
Request passed on by email or verbally
Supplier created with its product family
Require
Document list built case by case
Requirements set up by product or supplier family
Collect
Manual reminders, scattered files
Free supplier portal, automatic reminders until upload
Check
Reading and re-keying every document
AI pre-validation, data extraction, reasoned rejection
Decide
Progress known only to the quality team
Approval status of the supplier and of the product-supplier pair, visible to purchasing
With Tracklab
AI prepares the check; your quality team keeps the decision: every acceptance or rejection is dated and traced.
After approval: keeping the file up to date
An approved supplier only stays approved if its file remains valid. Expiry dates of certificates and documents are tracked, and new versions are requested before they lapse through document renewal. When a new version arrives, what has changed since the previous one is flagged.
Sources
IFS Food version 8, chapter 4.4 "Purchasing" and KO requirement 4.2.1.3.
Client results: data reported by Tracklab clients, quoted anonymously.
Client results
What our clients measured.
Three manufacturers that regularly approve new suppliers, presented anonymously.
Animal nutrition · Manufacturer−50%supplier approval lead time
Before Tracklab, document management relied on Excel files, shared folders and email exchanges.
Raw material approval status shared between quality and purchasing
Expiry dates tracked with automatic supplier reminders
AI pre-validation and version comparison
“What Tracklab brings is very concrete: a real-time view of risks, targeted alerts on critical points and a supplier and product database you can finally rely on.”Operations Director, animal nutrition
Flavours and fragrances · Manufacturer−70%time spent on supplier approvals
Heavy approvals, with multiple sign-offs and back-and-forth between teams and suppliers.
Approval statuses by supplier and by material-supplier pair
Shared visibility between quality, regulatory and purchasing
Document completeness rate up 80%
“Our feedback is heard, discussed and often built into the platform's developments, which strengthens adoption by the teams.”Regulatory Affairs Manager, flavours and fragrances
International trading · Food and chemicals−60%supplier approval lead time
Approval lead times incompatible with a trading model, and missed opportunities.
Approval status tracked in real time
Document collection, tracking and renewal automated
Regulatory blockages down 80%
“Tracklab turned compliance from a cost centre into a real performance lever.”Operations Improvement Manager, international trading
Results measured and reported by Tracklab clients, presented anonymously.
Features involved
Supplier approval, feature by feature.
The Platform pages detail each building block used in this use case.
Request the approval, define the required documents according to the product family, collect them from the supplier, check them, then decide the status: approved, rejected or pending.
Which documents should you ask a new supplier for?
Depending on the product family: certificates (IFS, BRCGS, FSSC 22000, organic…), specification sheets, declarations (allergens, GMO, food contact), supplier questionnaire, signed specifications and, where relevant, recent analyses.
How long does supplier approval take?
It depends on the number of documents required and on how responsive the supplier is. At Tracklab clients, supplier approval lead time has been cut by 50 to 60%.
Who approves the supplier: quality or purchasing?
Quality approves the compliance of the supplier and its products; purchasing needs to know the status to order. In Tracklab, the approval status is shared between both teams.
What is a supplier approval form?
It is the document that brings together the supplier's identity, its certifications, the products concerned and the approval decision. In Tracklab, it is replaced by the supplier record, which holds documents, statuses and the history of decisions.
What does a supplier approval request contain?
The supplier and its contact details, the product families concerned and the purchasing need. It is what triggers the list of documents to require.
How do you approve a foreign supplier?
The Tracklab supplier portal is multilingual and free for the supplier: it uploads its documents with no licence or installation.
Their quality and purchasing teams collect, control and leverage their supplier data with Tracklab.
150+
companies supported
40,000+
suppliers referenced
90,000+
products and ingredients
Customer testimonial · Bouvard
“Tracklab has eliminated the blind spots that existed in our document monitoring. Every document is analysed, every change is detected and every decision is traceable. This has enabled us to take a real step forward in terms of professionalism and credibility, particularly with auditors and customers.”
EVEllen V.Quality Director, Bouvard Pro
CyberVadis Excellence rating
Independent assessment of our cybersecurity framework and of the protection of the data entrusted to Tracklab.